FAQs
More FAQs- Are there instructions to follow after my carpets are cleaned?
- Isn't urethane more expensive than a traditional acrylic finish?
- How long will it take to have my floors coated with acrylic?
Immediately after cleaning, it’s best to allow carpets to dry for 6-8 hours before walking on them. Walking on them may flatten the fibers. Use air movers if needed to help air circulation as this will speed up the drying time. If a carpet protector such as ScotchgardTM was applied, foot traffic should be minimized for up to 24 hours to let the product cure. Don’t move any furniture back in place until carpet is completely dry or the Scotchgard carpet protector has cured.
Yes and no. The cost of product per square foot for the application of urethane finish is more than an acrylic finish. However, customers will see a return on the initial investment in urethane because of the reduced need for ongoing regular maintenance. As a facility manager, this will also result in fewer disruptions within your premises.
Preparation will depend on the condition of the existing floor, current number of coats, repairs required, etc. When applying an acrylic finish, stripping of the old finish is usually necessary. When that’s the case, finish removal plus the application of 3 coats of finish requires 1 hour for every 150 square feet of flooring. Generally, 3 coats of finish are required to achieve the desired effect. If a floor does not require stripping, it can generally be shower scrubbed which is a procedure used for preparing a floor for receiving a new layer of finish. Once that has taken place, a floor can be recoated at anywhere from 4,000 to 6,000 square feet per hour.