FAQs
More FAQs- Is urethane slippery when wet?
- When will I be able to walk on my floors?
- What is post construction cleaning?
Any coated surface can be slippery when wet. Our urethane product is considered to have acceptable slip resistance according to the American National Standards Institute (ANSI)/National Floor Safety Institute (NFSI) B101.3-2012 test method for measuring wet dynamic coefficient of friction (DCOF) of common hard-surface floor materials. We offer optional additives to create high slip resistance (lower probability of slipping) for wet environments or areas of concern.
Hard-surface floors treated with an acrylic finish can be lightly walked on within an hour after the last coat was applied. We recommend allowing the floor to dry for 24 hours before allowing heavy traffic on it.
Construction clean-up is a service provided to brand new buildings or buildings that are being remodeled. While building contractors will do a general clean-up of construction debris, a detailed clean is required to remove all the dust and dirt left behind.