FAQs
More FAQs- How long will it take to have my floors coated with acrylic?
- Are there instructions to follow after my tile & grout surfaces are cleaned?
- Will the application of urethane disrupt my business?
Preparation will depend on the condition of the existing floor, current number of coats, repairs required, etc. When applying an acrylic finish, stripping of the old finish is usually necessary. When that’s the case, finish removal plus the application of 3 coats of finish requires 1 hour for every 150 square feet of flooring. Generally, 3 coats of finish are required to achieve the desired effect. If a floor does not require stripping, it can generally be shower scrubbed which is a procedure used for preparing a floor for receiving a new layer of finish. Once that has taken place, a floor can be recoated at anywhere from 4,000 to 6,000 square feet per hour.
Stay off freshly cleaned tile for at least 30 minutes and avoid getting any liquid on the floor for 24 hours if sealant has been applied. Return furniture (with suggested use of felt pads) and rugs to floors after 24 hours.
The initial application process will require stripping any existing coatings and applying urethane coating plus drying time. This process can be done after hours and will require only daily cleaning for the life of the finish, averaging two years. Because there is no buffing or recoating for that time period, there will be no other disruptions. The reapplication process will not require further stripping.